POWER SHUTDOWN FOR A MAJOR UPGRADE

We worked in with Waipa Networks on a major upgrade, replacing multiple poles, crossarms and wires along 2.3 km of Saint Leger Road, Te Awamutu.

Our TMP team designed a plan to complete the lot in a single day across multiple closures. A team of 10 ran two and three-way stop/go setups and shoulder closures so residents and road users could still get through while Waipa Networks worked to their timeframe.

PROJECT DETAILS

CLIENT

Waipa Networks


DATE

21 October 2021


PROJECT TYPE

Residential