POWER SHUTDOWN FOR A MAJOR UPGRADE
We worked in with Waipa Networks on a major upgrade, replacing multiple poles, crossarms and wires along 2.3 km of Saint Leger Road, Te Awamutu.
Our TMP team designed a plan to complete the lot in a single day across multiple closures. A team of 10 ran two and three-way stop/go setups and shoulder closures so residents and road users could still get through while Waipa Networks worked to their timeframe.
PROJECT DETAILS
CLIENT
Waipa Networks
DATE
21 October 2021
PROJECT TYPE
Residential